Receive installation order and appoint Installation Engineer
1. Installation mode < br > 2, installation environment: < br > 3, actual installation location < br > 4, confirmation of installation time < br > 5, site photos and drawings, effect drawings, etc. Wall load-bearing information, etc
Design and installation drawings, confirm with users, design wiring drawings, provide wire specifications, length. Design drawings of embedded parts and load-bearing parts so that customers can construct and install ahead of time
Complete installation and commissioning within specified time limit
Preparing training materials and training related personnel
Prepare acceptance report and final acceptance: After the system construction and commissioning are completed, the system acceptance will be carried out. Aiming at the function and effect of the system. Overall function testing: < br > 1, the installation requirements are level, and the connection with the ground is stable; < br > 2, display performance testing; < br > 3, system function testing